What We Provide
Scope, standards and the projects it has run on
Ifmira builds and maintains the lines that move product from the wellhead onward. Our crews have delivered welding scopes across multiple kilometre-post sections for Oilserve, and constructed and buried flowlines at SEPLAT wells OHS-3 and OHS-4.
We mobilise our own welding fleet, excavation plant and pipe-location equipment, which keeps schedule risk with us rather than with a chain of hired subcontractors.
What this scope includes
- Right-of-way clearing, grading and trenching
- Pipe stringing, line-up and root/fill/cap welding
- Hot and cold tie-ins to existing facilities
- Flowline burying, backfill and reinstatement
- Hydrotesting, pigging and pre-commissioning support
- Holiday detection and coating repair
- Planned and breakdown pipeline maintenance
Delivered under this service line
Client name withheld
Pipeline Welding — KP 3+454 to KP 5+000 and KP 5+000 to KP 6+5...
Provision of welding for two crew scopes covering kilometre posts 3+454 to 5+000 and 5+000 to 6+500.
Client name withheld
Pipeline Welding — KP 0 to KP 1+175 (Land Section)
Provision of welding for the land section of the line, kilometre post 0 to 1+175.
Client name withheld
Flowline Construction & Burying — Well OHS-3
Construction and burying of flowlines for well OHS-3.
Client name withheld
Flowline Construction & Burying — Well OHS-4
Construction and burying of flowlines for well OHS-4.